calculate EVM & RATE ANALYSIS ENGINE Earned Value Management • Cost Control

Bill of Quantities (BOQ) & Cost Estimation

Unit rate breakdown, contractor margin analysis, EVM variance tracking, and CSV import/export.

download Export CSV
trending_up

Earned Value Management (EVM) Performance Cockpit

Real-time Cost & Schedule Variance indexes (BAC, EV, PV, AC, CPI, SPI)

CPI: 1.05 (Under Budget) SPI: 0.94 (Schedule Delay)
Planned Value (PV) PKR 140.40M Baseline budget target
Earned Value (EV) PKR 132.60M Value of work done (85%)
Actual Cost (AC) PKR 125.80M Real expenditure to date
Cost Variance (CV) +PKR 6.80M Cost Savings
Schedule Variance (SV) PKR -7.80M Schedule slippage
Estimate at Compl. (EAC) PKR 148.57M Projected final spend
Total Estimated BOQ

PKR 0

0 active line items
Est. Material Takeoff

PKR 0

Supply procurement takeoff
Est. Direct Labor

PKR 0

Wages & subcontractors
Est. Plant & Equipment

PKR 0

Machinery & fuel allocation

receipt_long Bill of Quantities Master Schedule

Showing 0 items for Green Valley Residencia Block F
Item Code Project Description Category Qty / Unit Unit Rate (PKR) Material Labor Equipment Total (PKR)
No BOQ items recorded for this project yet. Use "Add BOQ Item" or "Import CSV" to begin.
post_add

Add BOQ Line Item

tune Rate Analysis Breakdown Engine

Derive composite rate from Material + Labor + Equipment + Overhead% + Margin%

Computed Total Amount:

precision_manufacturing Rate Analysis Engine

Formula: Unit Rate = Direct Costs (Mat + Lab + Equip) + Overhead % + Contractor Margin %

Prime Direct Cost (Mat + Lab + Equip):
Overheads (%):
Profit / Margin (%):
Calculated Composite Unit Rate:
file_upload

Import BOQ from Excel / CSV

Supported headers: Item Code, Project, Category, Description, Unit, Quantity, Unit Rate

💡 Import Guidance:

• Save your Excel sheet as CSV (Comma delimited).

• Missing material/labor breakdowns will be estimated automatically based on unit rate.